Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night’s sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids’ version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it’s the ultimate companion for your next camping getaway.
Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag
Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg
Package Content
Single Sleeping Bag x 1
Carry bag x 1
This product comes with 1 year warranty
Shipments to the specific postcode-suburb combinations below are excluded. If you wish to proceed with orders to these zones with additional shipping costs, please reach out to us for assistance.
6515
| Weight | 2.1 kg |
|---|---|
| Dimensions | 43 × 31 × 29 cm |
| Brand | |
| Color | |
| Manufacturer Warranty |
You must be logged in to post a review.
Reviews
There are no reviews yet.